Posts Tagged ‘Chillers’

February 1, 2016 @ 9:59 am

Havtech furnished a completely prefabricated mechanical/electrical equipment room for this project.  Given the design parameters, the manufacturer designed and produced a 2,000+ ton, 5,000 ft2 equipment room that would have been twice as large and more expensive had it been field-built. Holy Cross Germantown 19801 Observation Drive, Germantown, MD Owner: Holy Cross Health Built: 2014 MEP Engineer: Syska Hennessy Group General Contractor: Whiting‐Turner Mechanical Contractor: Bell BCI The Challenge Hospitals are heavily regulated as to net square feet, number of beds, services offered, and fees charged. The challenge is ...

Havtech can provide comprehensive HVAC solutions that include all the major equipment for your project.  This case includes magnetic bearing chillers, vertical riser fan coils, Dedicated Outside Air Systems (DOAS), and Variable Refrigerant Volume (VRV) systems. Virginia Square Towers 3444 Fairfax Drive, Arlington, VA Owner: Dittmar Companies Built: 2014 MEP Engineer: JB Wyble Associates Contractor: Dittmar Companies The Challenge Use a holistic approach to produce luxury high‐rise apartment buildings that have the lowest life‐cycle cost. Nearly 50‐year‐old Dittmar Company builds and holds residential properties—currently 24. Quality workmanship and ...