Posts Tagged ‘Frictionless Chillers’

February 1, 2016 @ 9:59 am

Havtech furnished a completely prefabricated mechanical/electrical equipment room for this project.  Given the design parameters, the manufacturer designed and produced a 2,000+ ton, 5,000 ft2 equipment room that would have been twice as large and more expensive had it been field-built. Holy Cross Germantown 19801 Observation Drive, Germantown, MD Owner: Holy Cross Health Built: 2014 MEP Engineer: Syska Hennessy Group General Contractor: Whiting‐Turner Mechanical Contractor: Bell BCI The Challenge Hospitals are heavily regulated as to net square feet, number of beds, services offered, and fees charged. The challenge is ...