Cato Institute
The Cato Institute wanted to expand their existing building while minimizing construction impact so that the building could remain useable and open to tenants.

Energy Savings
Replaced failing packaged rooftop units for energy savings.

Minimal Equipment Downtime
Minimized field labor and coordination issues.

Space Optimization
Placed package above premium space due to its acoustic features.
Our factory-built solution allowed the existing building to transfer to the new HVAC system air handlers and chillers while occupied without significant interruption to the system operation.