Service: Central Plant
![](https://www.havtech.com/wp-content/uploads/2020/10/san-juan-thumb.jpg)
The Mall of San Juan needed to provide high quality mechanical systems for it’s 650,000 square foot new construction with a limited skilled workforce.
![Critical Environments](https://www.havtech.com/wp-content/uploads/2020/10/CriticalEnvironments.png)
Holy Cross Hospital needed to maximize the usable interior space of the hospital with a flexible solution that provided for the future growth of their operations.
![](https://www.havtech.com/wp-content/uploads/2020/10/cato-thumb.jpg)
The Cato Institute wanted to expand their existing building while minimizing construction impact so that the building could remain useable and open to tenants.