Service: Chillers
Design a solution to reduce noise sound output and to reduce overall sound energy of a chiller.
The Mall of San Juan needed to provide high quality mechanical systems for it’s 650,000 square foot new construction with a limited skilled workforce.
Holy Cross Hospital needed to maximize the usable interior space of the hospital with a flexible solution that provided for the future growth of their operations.
The Cato Institute wanted to expand their existing building while minimizing construction impact so that the building could remain useable and open to tenants.