In November 2025, a chiller plant failure at a CyrusOne data center near Chicago knocked CME Group’s trading platform offline for nearly ten hours, which froze operations in the middle of the trading day. The cause wasn’t a network issue or software bug; it was cooling.
The outage is a reminder that cooling is part of the data center’s critical infrastructure. Capacity, redundancy, maintainability and future rack density all need to be considered before equipment is specified. If you’re in the midst of comparing cooling solutions, you’re getting ahead of the problem. Building a solid spec before it’s bid on and aligning facility and IT puts you in a position to catch a mismatch before it threatens the performance of your facility.
The Types of Data Center Cooling Systems to Consider
Rack density, infrastructure, budget, and growth look different for every facility. A legacy facility built around air cooling can’t swap to immersion cooling overnight, and a facility running standard workloads doesn’t need to overbuild to meet AI demand. Understanding each type of cooling system and how it meets the unique needs of your facility makes it easier to have a productive conversation with your team before specs are written.
Liquid Cooling vs. Air, Liquid and Hybrid Cooling
Air cooling is one of the most common choices for many data centers, especially where rack densities are moderate. CRAC and CRAH units, paired with hot and cold aisle containment, are familiar to most facility teams. It’s a straightforward and, in most cases, cost-effective cooling solution for lower- to moderate-density racks. As rack densities increase, however, air cooling can become more difficult and energy-intensive to manage.
Liquid cooling can pick up from there with rear door and direct-to-chip cooling. Rear-door heat exchangers can add cooling capacity at the rack, while direct-to-chip systems remove heat directly from high-heat components such as CPUs and GPUs. Immersion cooling is another option for extremely high-density workloads.
There’s also an option to combine the two, giving you the flexibility to reach higher-density loads while making use of existing infrastructure.
Data Center Cooling Requirements to Weigh Before You Specify
The priorities of the facility and IT team aren’t always aligned, but they should be. The facility team may prioritize redundancy and maintainability, while the IT team focuses on density and performance. These are the requirements both need to be aware of to ensure your cooling strategy supports both IT performance and facility reliability:
- Current and projected rack density: not just where you are today but where you’re projected to be in two or three years.
- Existing infrastructure: including available cooling capacity, power, piping, and space.
- Redundancy level: whether the facility requires N+1, 2N, or another approach
- Energy and water constraints: including operating costs and any site-specific limitations.
Total cost of ownership: factoring in both upfront cost and long-term operation.
How to Get Your Facility and IT Team Aligned
Picking the right system is ultimately the goal, but picking the right system and making sure facility and IT priorities are aligned is how you protect your facility. You get there by involving both teams, comparing priorities together, and settling on requirements before the spec goes out for bid.
Havtech works with both teams to weigh what these requirements mean for your facility so the system you specify reflects what everyone needs. Talk to an HVAC specialist about the different cooling solutions available to you.